Projects

Please take a moment to review this small sampling of our projects:

PDX Concourse A HVAC Upgrades Project

This HVAC system upgrade is a 36,280 square foot HVAC remodel of the Alaska Airlines Terminal & Operations Offices at the Portland International Airport in Portland, Oregon.  Hydro-Temp is providing the complete general contracting scope of work for this $850,000 project.  The existing packaged DX cooling...

READ MORE

Lowrie and Trillium Primary Schools

Currently under construction and on schedule to open for the 2013 school year.

These are identical schools in the West Linn-Wilsonville School District under construction concurrently.  HTM is working alongside P&C Construction on Lowrie PS and working alongside Howard S. Wright on Trillium PS. Both...

READ MORE

U of O Casanova Center Extension

The CasX is as architecturally sensitive of a project as there can be.  The client has the highest of standards for the Ducks football programs new state of the art 130,000 sqft operations building that will be unsurpassed in the nation.  This building features high end locker, position, team and media rooms...

READ MORE

Pactrust CTC651 (Nautilus Vancouver)

This CTC651 project is a design build project. It is intended to be the Nautilus headquarter, yet at the same time be universal for all possible future tenants. The current building consists of executive offices, four high density office space (cubical farm), fitness center, locker room, and break room. The interior...

READ MORE

Portland State University NW College of Engineering:

This project consisted of approximately 132,728 square feet of new, type 1 fire-resistive construction for labs, offices, and classrooms. It is constructed over an existing sub grade multi-level concrete-frame parking garage. There were also improvements made to the garage while still allowing students to park as needed....

READ MORE

University of Oregon: East Campus Residence Hall:

University of Oregon's newest 185,000 square foot residence hall is on track to achieve LEED Gold certification. This residence hall will be a live-learn facility with a kitchen, dining hall, multi-purpose room, classrooms and study areas all on the first floor. There are three towers to house 454 undergraduate students...

READ MORE

Eugene Water & Electric Board (EWEB) Roosevelt Operations Center

This facility is on track to achieve an LEED Gold certification for EWEB. The new operations center is a 52 acre site that consists of three main buildings totaling 168,957 square feet. The diverse systems in which this project includes are; solar hot water heating, heat recovery systems, radiant heating, service fluid...

READ MORE

University of Oregon College of Education

The University of Oregon College of Education task consisted of three projects; a new 66,000 square foot three story building on top of a 47,000 square foot parking garage, three historical renovations, and a remodel of the CSB building. These renovations brought the College of Education annex into the 21st century...

READ MORE

Veterans Administration Hospital (Bldg 101) - Air Handlers Upgrades Project

This Design-Build project is an upgrade to the VA Hospital's Air Handlers, located on Portland's Marquam Hill. Project objective is to extend existing HVAC system's life by 20 years. To that end, Hydro-Temp is replacing the existing heating coils, cooling coils, mechanical...

READ MORE

The WSU Applied Technology Classroom Building:

The WSU Applied Technology Classroom Building (ATCB) is the first building on the Washington State University Vancouver Campus located in what is envisioned to be the campus Science Precinct. The 42.6 million project is a 56,000 square foot building slated for LEED Gold Certification.  This is an important building...

READ MORE

Lane Community College Downtown Campus:

LCC DTC is aiming for LEED Platinum and be both a teachable and sustainable building. HYDRO-TEMP was selected as a member of the CMGC team for this fast track and highly complex building.  Not only will this building perform from a energy efficiency standpoint but it will also teach future energy professionals. ...

READ MORE

4310 SW Macadam (DHS/ICE)

The 4310 SW Macadam project is an Immigrations Customs Enforcement building that will be LEED Silver upon completion. Hydo-Temp is working with Hoffman Construction on this project.  Half of the project is a renovation of an existing project. The other part includes new parking garage and office space. We are installing...

READ MORE

Clackamas Court Courthouse Renovation Project - 2013

This project consists of a 3-story 5,826 SF addition to the Clackamas County Courthouse. The structure consists of load-bearing concrete masonry unit walls clad with brick veneer and concrete composite steel roof and floor decking. The basic function of the addition is a courtroom with holding cells and a vehicle...

READ MORE

Oregon State Hospital – Junction City

Oregon State Hospital – Junction City

...

READ MORE

The Portland Community College Cascade Campus

The Portland Community College Cascade Campus Academic Building is a new 3 story structure with an underground garage.  Hydro-Temp is working with Hoffman Construction on this steel and concrete building.  HTM is the lead on BIM coordination to ensure streamline installation of the Daikin AC system, HVAC, plumbing...

READ MORE

Legacy Hospital Portland

...

READ MORE

LCC Class Project 15-04-007

...

READ MORE

OSU Johnson Hall

...

READ MORE

Franklin High School

...

READ MORE

Test Project

...

READ MORE

UO Marcus Mariota Sports Center

...

READ MORE

Vose Elementary School

...

READ MORE

Kaiser

...

READ MORE